Dong Phuc Industrial Park, Bac Giang Province

Dong Phuc Industrial Park, Bac Giang province

Dong Phuc Industrial Park, Bac Giang Province

The Dong Phuc Industrial Park was approved under the 1/2000 zoning plan in Decision No. 1354/QĐ-UBND dated December 30, 2022, issued by the People’s Committee of Bac Giang province, and its investment policy was approved under Decision No. 258/QĐ-TTg dated February 10, 2025, by the Prime Minister. On June 27, 2025, the project was approved for a partial adjustment of the 1/2000 subdivision planning under Decision No. 767/QĐ-UBND of the People’s Committee of Bac Giang province.The Dong Phuc Industrial Park is currently accelerating site clearance and will begin infrastructure construction at the end of 2025, with secondary investment attraction expected to start in Q1/2026. Once operational, the project is expected to create approximately 41,000 jobs.

I. Overview of Dong Phuc Industrial Park

Dong Phuc Industrial Park covers 354.63 hectares, with a total investment capital of approximately VND 3,731.713 billion, including about VND 559.757 billion in contributed capital from the investor.

Below is an introduction to Dong Phuc Industrial Park by RSL Group:

INDICATOR INFORMATION
Project name Dong Phuc Industrial Park
Location Dong Phuc commune, Tu Mai commune, Yen Dung district, Bac Giang province; now Dong Nhan hamlet, Dong Viet commune, Bac Ninh province
Total area 354.63 ha
Operation period 50 years
Occupancy rate Updating
Investment industries High-tech, modern, environmentally friendly processing and manufacturing industries
Main traffic connection Adjacent to provincial road 299D
Construction regulations Maximum construction density: 70%; Maximum height: 5 floors

II. Location of Dong Phuc Industrial Park

Dong Phuc Industrial Park is located adjacent to Provincial Road 299D, providing convenient access to National Highway 37 via Provincial Road DT284, enabling smooth transport and logistics for investors.

Boundaries

  • Northeast: Adjacent to Provincial Road 299D
  • Northwest: Adjacent to agricultural land and residential areas of Tan Ninh, Tu Mai, and Dong Cao hamlets
  • West: Adjacent to the N1 drainage canal and the Cau River system
  • South: Adjacent to agricultural land and residential areas of Dong Nhan Hamlet and Hoang Phuc Village
Dong Phuc Industrial Park, Bac Giang Province
Transport connectivity of Dong Phuc Industrial Park

Traffic connectivity

  • Gia Binh Airport (planned): 36 km
  • Hanoi city center: 55 km (1 hour)
  • Noi Bai International Airport: 63 km (1 hour 10 minutes)
  • Dinh Vu Port (Hai Phong): 77 km
  • Cai Lan Port (Quang Ninh): 92 km
  • Huu Nghi Border Gate (Lang Son): 130 km
  • Van Don Airport: 145 km
  • Mong Cai Border Gate: 234 km
Dong Phuc Industrial Park, Bac Giang Province
Directions to the Dong Phuc Industrial Park Entrance

III. Infrastructure of Dong Phuc Industrial Park

Dong Phuc Industrial Park, Bac Giang Province
Master plan of Dong Phuc Industrial Park

The Dong Phuc Industrial Park is planned with the following technical infrastructure:

Internal road system: Main roads are 45 m, secondary roads are 22.25–31 m

Power supply system:

  • Short-term supply: from the existing 35kV overhead grid near the project area. Long-term supply: from the 110kV grid connected to the 220kV Yen Dung substation and the 110kV Duc Giang substation (under Bac Giang provincial planning 2021–2030, vision 2050)
  • Planned construction of two 110kV substations (Dong Phuc 01 & Dong Phuc 02), each with a capacity of 2×63 MVA to supply power to the entire industrial park.

Clean water supply system

  • Raw water sourced from the Cau river via a primary pump station and pipeline to the water treatment plant
  • Distribution network placed along main internal roads, pipe diameters from D160 to D500, hydrants installed along distribution pipes

Wastewater treatment system

  • Central treatment plant capacity: 9,300 m³/day, modern technology with automatic monitoring system, Includes an emergency reservoir and biological indicator pond
  • Treated wastewater is discharged into the receiving water source after meeting standards
Dong Phuc Industrial Park, Bac Giang Province
3D rendering of the wastewater treatment plant in Dong Phuc Industrial Park

Fire protection system

  • Fire water supply combined with domestic water network, minimum pressure at hydrant outlet: 10 m
  • Hydrants placed on pipes ≥ Ø100mm in loop networks, hydrant spacing: ≤ 150 m

Telecommunications system

  • Fully underground, main cable ducts using UPVC D110 pipes, buried per regulations
  • Road crossings via galvanized steel pipes

Other facilities: four designated parking areas

IV. Costs and investment incentives

The investment costs and incentive policies for Dong Phuc Industrial Park will be updated by Redsunland as soon as possible.

Dong Phuc Industrial Park, Bac Giang Province

This article highlights Bach Dang Industrial Park as a prime investment location for both domestic and international businesses. We believe this information from RSL Group is valuable to our readers.

Discover more about potential IPs/ICs in Vietnam here.

VI. RSL Group – leading investment consulting firm

When a business enters the stage of expanding production or building a new factory, there are numerous factors to consider – from selecting the right location, evaluating technical infrastructure, rental costs, and legal procedures to managing logistics, workforce, and supply chain efficiency.
Partnering with a professional consulting firm from the very beginning helps investors save time, costs, and resources while minimizing potential risks.
With nearly 4 years of experience successfully facilitating over 300 DDI and FDI projects totaling more than USD 4 billion in investment capital, Redsunland (a member of RSL Group) has become one of the leading investment consulting firms in Vietnam’s industrial real estate sector.
Thanks to its comprehensive service ecosystem and team of highly experienced consultants, investors partnering with RSL Group benefit from exceptional advantages:

  • Access the most competitive prices in the market, along with attractive investment incentive policies.
  • Negotiate directly with industrial park developers on behalf of investors regarding pricing, procedures, and all investment-related matters, while assisting in resolving legal issues and supporting factory design and construction.
  • Offer financial solutions with funding packages covering up to 80% of land and machinery value and 100% of factory and working capital costs.

Contact RSL Group today for detailed consultation on investment opportunities at Thai Ha Industrial Park.

RSL Group – Comprehensive investment promotion solutions

Selecting the appropriate consulting partner is crucial for a successful investment in Vietnam. RSL Group, with an experienced team, extensive property portfolio, and comprehensive service ecosystem, is dedicated to providing optimal investment solutions for our clients.

Connect with us:

RSL Group Company Limited

Address: Charmvit Tower, 117 Tran Duy Hung street, Ha Noi

Hotline: (+84) 913.933.593 – (+84) 912.949.393

Website: rslgroup.vn

Email: info@rslgroup.vn

LinkedIn: linkedin.com/company/rslgroup

Fanpage: facebook.com/rslgroup.vn

Youtube: youtube.com/@redsunland