Address
Charmvit Tower, 117 Tran Duy Hung Street, Trung Hoa Ward, Cau Giay District, Hanoi, Vietnam
Hotline: (+84) 913.933.593 - (+84) 912.949.393
Email: info@rslglobal.vn
Address
Charmvit Tower, 117 Tran Duy Hung Street, Trung Hoa Ward, Cau Giay District, Hanoi, Vietnam
Hotline: (+84) 913.933.593 - (+84) 912.949.393
Email: info@rslglobal.vn

Bac Chu Lai Industrial Park is one of the Industrial Parks of Chu Lai Open Economic Zone, whose planning was approved by the Prime Minister in Decision No. 43/2004/QD-TTg dated March 23, 2004, with total area of 361.4 hectares in Tam Hiep commune, Nui Thanh district, Quang Nam province.

RSL Group would like to introduce an overview of the Bac Chu Lai Industrial Park project as follows:


Bac Chu Lai Industrial Park has very convenient advantages in terms of transportation, seaport, and airport. Specifically, Bac Chu Lai Industrial Park stretches along National Highway 1A and the North-South railway. The main road of the industrial park connects to National Highway 1A. Connected to the main road connecting Tam Hiep port with Da Nang – Quang Ngai highway. In addition, Bac Chu Lai Industrial Park is also adjacent to Road DT 617 connecting National Highway 1A with Dakto (KonTum), which is the main traffic axis connecting the western districts of Quang Nam province and is also a road connecting raw material sources. from communes and districts in the western part of the province.
Operating in the Bac Chu Lai Industrial Park, the enterprises’ factories are built on land with synchronous infrastructure, electricity, water, postal and telecommunications services are provided to the base of the campus factory.
Internal traffic: The site has been completed with internal traffic routes in the industrial park and connection to National Highway 1A.
Electrical system: Power is supplied from the national grid through Ky Hoa 220/110KV transformer station with 2 transformers with a capacity of 40 MVA each, providing stable electricity for North Chu Lai Industrial Park.
Clean water system: Clean water is provided by Tam Hiep Water Plant with a total capacity of 20,000 m3/day, ensuring enough water supply 24/24, connected to the fence of businesses in the Industrial Park. North Chu Lai.

Wastewater treatment system: Bac Chu Lai Industrial Park has a complete wastewater collection and treatment system with a capacity of 1,900 m3/day, completed and put into operation in 2013, ensuring treatment for all wastewater treatment systems for all businesses.

Telecommunications system: The telecommunications system meets international standards, fully meeting the needs of communication, high-speed data transmission and domestic and international postal services.
Other utilities: Agribank Chu Lai Open Economic Zone, Vietcombank, BIDV, Dong A Bank; Nui Thanh Post Office; Nui Thanh bus system; Security system; Quang Nam Central General Hospital in Tam Hiep commune, Nui Thanh district; Worker housing project is underway…
Investors in Bac Chu Lai Industrial Park have the right to choose and decide on the form of project implementation (regardless of domestic and foreign investors) and enjoy the Government’s highest preferential policies for investors in Chu Lai open economic zone.
Some companies are operating in Bac Chu Lai Industrial Park:



RSL Group – Comprehensive industrial real estate ecosystem
Hotline: 0912.94.93.93 – Ms. Thanh Ha
Website: https://www.rslgroup.vn/
Email: info@redsunland.vn
Source: redsunland.vn